What drives the cost of demolishing a warehouse?
Frame, roof, contents, slab and waste route: the five things that decide what a warehouse demolition quote looks like.
Short, direct answers to the questions owners and developers ask before demolishing a warehouse, removing a slab or getting rid of rubble.
The blog is organised around five kinds of question, because each one serves a different moment in a project.
Questions such as whether a slab or hardstanding must be removed, or whether all rubble has to leave the site, are answered in the posts where they belong.
Frame, roof, contents, slab and waste route: the five things that decide what a warehouse demolition quote looks like.
Volume, space, clean feed and a use for the aggregate: the four conditions that make crushing rubble on site worthwhile.
Mixed fractions, missing receipts, asbestos in the skip and unauthorised skips on the road: waste mistakes and how to avoid them.
Broken sheets, hidden asbestos, unapproved plans and mixed waste: the failure points of a warehouse demolition with a fibre-cement roof.
Access, volume, weight, sorting and permits: a side-by-side comparison of skips and rubble bags for demolition waste.
Partial demolition, strip-out, new roof or keeping the slab: when an old warehouse does not need to be knocked down completely.
From sledgehammer to hydraulic breaker and saw cutting: which slab removal methods work, which ones fail, and why.
First photos, site visit, preparation, demolition sequence, sorting and handover: what a machine demolition with us actually looks like.
Tall frames, top-down work and tight urban sites need a long-reach machine; low naves and houses usually do not. Here is how to tell.
Twelve questions to ask before hiring an industrial demolition contractor: scope, asbestos, waste, safety, permits and communication.
Send photos, the approximate floor area and the location. We reply in English or Spanish with the questions that matter for a quote, with no obligation.