In short
We break out concrete floor slabs, yards, patios, driveways, ground beams and foundations with hydraulic breakers and crushers, separate the steel and remove the rubble. How deep we go is agreed beforehand according to what your project or buyer needs, and the plot is left at a basic level afterwards.
Contents
- Slab, hardstanding or foundation: what exactly is being removed?
- Do all the foundations have to come out?
- How is a concrete slab removed?
- Patio and driveway removal at villas and commercial premises
- Ground beams, pits, ramps and buried services
- After the break-out: backfill, levels and handover
- Can I remove foundations or a slab myself, and is a permit needed?
- Frequently asked questions
Slab, hardstanding or foundation: what exactly is being removed?
Foundation removal and slab removal are different jobs, and naming them correctly is the first step to a usable quote. A slab is the concrete floor or yard at ground level; foundations are the elements below it that carried the building: pad footings under columns, strip footings under walls and ground beams linking them.
- Floor slab: the interior floor of a warehouse or house, often reinforced with mesh, sometimes with a separate screed or industrial finish on top.
- Hardstanding: yards, loading areas, car parks and access roads, usually thicker at entrances where lorries turned.
- Patios and driveways: the concrete or tiled surfaces around villas and commercial premises, often laid over an older surface.
- Ground beams and footings: heavily reinforced concrete below ground, as in the photo on this page, where beams are broken out with a hydraulic breaker beside a steel hall.
- Pits, ramps and channels: inspection pits, weighbridge pits, loading ramps and drainage channels found on many industrial sites.
Do all the foundations have to come out?
Only if the next use of the site needs it. Old foundations can clash with new ones, with basements or with drainage, and in that case they must go. Where the new building's project avoids them, or where the plot is sold for a buyer to decide, leaving them in place may be acceptable. The decision belongs to the project and its técnico, and it should be written into the scope.
Two practical points help. First, ask for the original drawings if they exist: they show where footings and beams are and roughly how deep. Second, if there are no drawings, a few trial holes with the machine before the quote is fixed tell both sides what is under the slab, which avoids surprises later.
The post on the best and worst ways to remove a concrete slab discusses the trade-offs, and the reinforced concrete techniques guide covers how heavily reinforced elements are broken.
How is a concrete slab removed?
A concrete slab is removed by breaking it into manageable pieces with a hydraulic breaker or crusher mounted on an excavator, lifting the pieces, separating the reinforcing mesh or bars and loading the concrete as a clean fraction. On thin, lightly reinforced slabs the machine can often lever up sections after a few breaks; thick industrial floors need systematic breaking across the whole area.
The order of work matters on larger areas. Breaking from one side towards the exit keeps the machine on solid ground and the loading point accessible. Where services run under the slab, they are located beforehand and the slab around them is opened carefully. Near buildings that stay, breaking is done with smaller equipment and lower energy to limit vibration.
The result is concrete free of steel, which can go to an authorised facility as concrete (17 01 01) or, where it suits the project, be crushed on site as described on our crushing and recycling page.
Patio and driveway removal at villas and commercial premises
Patio removal and driveway removal at private properties are smaller in area than industrial slabs but often more awkward: narrow access, gardens and pools close by, retaining walls under the edges and neighbours a few metres away. A compact machine with a breaker usually does the work, and the rubble leaves in a skip or directly on a small lorry.
It is worth checking what lies under an old patio before deciding the scope. Layers of tiles over older concrete, buried planters and pipes for irrigation or pool equipment are common on the Costa del Sol. Telling us what the area will become, a new terrace, a lawn, a driveway with a different gradient, helps decide whether the base layers stay.
When the patio is part of a wider garden project with terraces, outbuildings or a pool, our sister site Demolición de Piscinas Costa del Sol covers terraces and outbuildings in detail.
Ground beams, pits, ramps and buried services
Below-ground elements on industrial plots are where time and cost are hardest to estimate, because nobody sees them until the slab is open. Ground beams are often more heavily reinforced than anything above ground; pits and ramps may be lined with thick walls; old tanks, separators and drainage chambers can appear in yards.
We break ground beams and footings with a hydraulic breaker, then use a crusher or shears to free the rebar. Pits are demolished wall by wall and the void backfilled as specified. Anything unexpected, such as an old tank, a chamber with residues or material that may contain asbestos, is stopped, reported to you and your técnico, and dealt with before work continues. That rule is in the quote from the start, so that a discovery does not turn into an argument.
The rubble from below-ground work is often mixed with soil. Keeping concrete and soil separate as far as possible makes both easier to manage, as our rubble removal page explains.
After the break-out: backfill, levels and handover
Once slabs and foundations are out, the plot has holes where footings and pits were and a surface that is uneven from the machine. After the demolition we remove the remains and leave the plot at a basic level, with voids filled as agreed. Engineered fill, compaction to a specification and earthworks for a new project are a separate scope, normally for your groundworks contractor.
For residential plots, our sister site covers basic groundworks and levelling after demolition. Before handover we agree with you or your representative the condition of the plot, and the delivery receipts for every load are sent so that the waste file is complete.
Can I remove foundations or a slab myself, and is a permit needed?
Breaking out reinforced concrete without the right machine is slow, noisy and risky, and the waste still has to be sorted and delivered to an authorised facility with proof. For a small garden patio some owners do it themselves; for slabs and foundations on any scale, it is a contractor's job.
Whether a permit is needed depends on the works. Removing foundations as part of a building demolition falls within that demolition's declaración responsable or licence; small works on an existing property may have their own procedure. Each ayuntamiento sets its documents and timings in its ordinance, so check with your técnico or the town hall. The guide to waste rules and responsibilities explains who answers for the rubble.
Frequently asked questions
How do I know if my slab needs to be removed?
Ask what will be built or used on the site. If new foundations, basements or drainage clash with the old slab, it must go; if the area stays as hardstanding, it may not.
Can you remove only part of a concrete yard?
Yes. The area is cut or broken along an agreed line so that the remaining hardstanding keeps a clean edge.
Will removing a patio damage my garden?
Some disturbance at the edges is unavoidable, but access routes, protected areas and plants to keep are agreed before work starts.
Is removing reinforced concrete harder?
Yes. The steel holds broken pieces together, so the concrete has to be crushed or cut to free the bars, which takes longer than plain concrete.
How long does it take to remove a concrete slab?
It depends on area, thickness, reinforcement and access. A small patio can be a short job; an industrial floor is planned in days or weeks.
Do you remove driveways?
Yes. Concrete and paved driveways are broken out, the rubble removed and the base left as agreed for the new surface.
What if you find something under the slab?
Work in that spot stops and we inform you and your técnico. Tanks, residues or suspected asbestos are dealt with properly before we continue.
Can old foundations stay in the ground?
Sometimes, if the new project allows it. That decision is made by your técnico and written into the scope.
Can the broken concrete be reused?
Clean concrete can be crushed into aggregate. Whether it can be reused on your site is decided by your project.
Do you fill the holes left by foundations?
Voids are filled and the plot left at a basic level as agreed. Engineered fill for a new building is a separate groundworks scope.